When standard fire testing stops at traditional drywall, where does that leave a 50 kW AI rack?

AI workloads and hyperscale growth are pushing European rack densities past 30–50 kW, introducing high-risk infrastructure like liquid cooling and lithium-ion UPS. Yet legacy fire codes fail to address modern sandwich panels, dense penetrations, and structural deflection, exposing critical facilities to costly compliance failures and downtime.

This whitepaper bridges the gap between high-speed data centre construction and stringent fire safety regulations, delivering a clear blueprint to de-risk high-density builds.

Download it now for your guide to:

  • Modeling complex penetrations upfront to resolve trade clashes and avoid schedule delays
  • Solving sandwich panel and structural deflection challenges with custom-tested details
  • Adapting modular builds to regional European codes to satisfy insurers and safeguard SLAs