Data center design is the future of sustainable IT
The relationship between IT workloads and the core infrastructure needs to be designed and built with more flexibility to enable facilities to scale to meet increasing demands
The relationship between IT workloads and the core infrastructure needs to be designed and built with more flexibility to enable facilities to scale to meet increasing demands
The US has plans for a network of electromagnetic monitoring stations to predict geomagnetic disturbances
The data center sector in general must more clearly demonstrate the value it can bring to a community
The supply chain is in crisis - what do we do?
Exploring flat roof fire resilience for data centers and mission critical buildings
How to become a data center disruptor in markets that have run out of available space
Discussing hybrid design in hyperscale data centers
With integrated project delivery, all your stakeholders collaborate from the start
Examining the next ten years. A look at what the future holds for the data center industry
Want space? The answer could be under your feet
The advantages of roof and cover boards for data centers
Protect your data center, enhance performance, and reduce costs from the top down
To integrate or not? How to determine if the multi-trade approach is right for you.
How to meet different demand scenarios
Data4’s Davide Suppia on the transformation of Italy’s data center landscape
Like a classic Bell curve, modern construction approaches can range from pure volumetric modular on one end and pure traditional construction on the other
Could augmented reality be the future of data center construction?
techUK responds to West London data center power coverage
Digitization could also be the answer to making the grid more efficient
As in Dublin, Singapore, Amsterdam and Frankfurt, digital developments in London could face opposition
How long till Loudoun demands microgrid power for data centers?
Collaborative efforts point the way to standardized, more reliable reporting structure
It's all about the embodied carbon
Data4’s Olivier de Nomazy examines the driving forces that will shape the future of the data center